Publications & IP

NEMOSYS

Publications & IP

Publications


2025
42

Conceptual Design of a Reliability-Change Monitoring System for Railway Vehicle Components. JW Kim, DS Jeong, KS LEE, JY Lee./ Proceedings of the 2016 Spring Conference of the Korean Society for Reliability, pp. 205–205.

41

Design and Implementation of an Anomaly Diagnosis Model Based on an LSTM Autoencoder for Early Detection of Airframe Leakage. YS Kim, M Kim, AJ Endharta, YK Park. / Reliability Applications Research, Vol. 24, No. 1, pp. 56–63.

2024
40

Design and Implementation of an AI-Model–Based Approach for System Anomaly Diagnosis. YS Kim, M Kim, AJ Endharta, YK Park./ KSME (Korean Society of Mechanical Engineers), Reliability Division, 2024 Spring Conference [Abstracts].

39

Performance Comparison of Similarity-Based Models for Anomaly Detection in Ground Mobility Equipment Engines. (M Kim, YS Kim, NH Kim, BW Choi / Proceedings of the Korean Society for Reliability Conference No. 1, pp. 134–134)

38

A Study on Development of PHM Technology for Rubber Tires in Light Rail Vehicles(AJ Endharta, DS Jeong, CL Lee, KE Kim / Journal of the Korea Academia-Industrial Cooperation Society, vol.25, no.2 / 691-699 (9page))

2023
37

Development of a Logical ERD for Automated Implementation of Railway Facility Performance Evaluation Data.(WS Oh, JY Kwon, JW Kim / The Transactions of the Korean Institute of Electrical Engineers, Vol. 72, No. 10, pp. 1244–1249, 2023.)

36

Study on Effectiveness of CBM+ in Weapons Systems through RAM-C Analysis(AJ Endharta, YS Kim, JW Kim, IH Cho, YK Park / Journal of the Korea Academia-Industrial Cooperation Society, vol.24, no.9 / 249-256 (8page))

35

A Study on Simulation-based CBM+ Effect Analysis Method(DS Jeong, JM Song, JW Kim / Proceeding of 2023 Conference of Korea Institute of Military Science and Technology)

34

Development of reliability management S/W to improve system reliability and safety (M Kim, JY Yoo, JW Kim, AJ Endharta / Proceedings of 2023 Spring Conference the Korean Society for Railway / 72-72 (1page))

33

Development of condition-based maintenance platform for metro vehicle tires(JY Yoo, AJ Endharta, JW Kim / Proceedings of 2023 Spring Conference the Korean Society for Railway / 204-204 (1page))

32

Development of the condition diagnosis algorithm and maintenance system for railroad power distribution lines(JY Yoo, AJ Endharta, JW Kim / Proceedings of 2023 Spring Conference the Korean Society for Railway / 205-205 (1page))

31

Development of Failure Reporting, Analysis, and Corrective Action System Support S/W for Railway Components in Test Stage(SY Kim, JW Kim / Journal of the Korea Academia-Industrial Cooperation Society, vol.24, no.3 / 451-459 (9page)

2022
30

Development of S/W for the Establishment of Data Collection and Analysis System for System Development in Test Stage(SY Kim, AJ Endharta, JW Kim / Journal of the Korea Academia-Industrial Cooperation Society, vol.23, no.11 / 570-578 (9page))

2021
29

A Study on the Derivation of Safety Requirements from Preliminary Hazards Analysis (PHA) for New Electric Multiple Unit (BS Park, GY Sin, JW Kim, JS Koo / Journal of The Korean Society For Urban Railway, vol. 9, no. 4 / 1143-1150 (8page))

28

Proportional Hazard Model of Rubber Tires in Metro Vehicles for Maintenance Scheduling (JY Yoo, DS Jeong, AJ Endharta, CJ Lee, S Kim, I Kwon / Proceedings of 2021 Fall Conference the Korean Society for Railway / 284-284 (1page))

27

Study on the Hazard Development Procedures for Accident Scenarios for Risk Assessment(SY Kim, AJ Endharta, JW Kim / Journal of the Korea Academia-Industrial Cooperation Society, vol.22, no.10 / 518-526 (9page))

26

A Study to Determine Optimal Inspection Intervals Using a Multi-Criteria Decision Model (M Park, DK Kim, JW Kim, DH Park, BN Park, JH Park, MO Song, S Sung, KM Jung, JH Lim / Journal of Applied Reliability, vol. 21, no. 3 / 282-293 (12page))

25

A Method for Monitoring Reliability Change after Preventive Maintenance (JW Kim, AJ Endharta / Journal of the Korean Society for Urban Railway, vol.9, no.3 / 981-987 (7page))

24

A Quantitative Risk Assessment for Public Commercial Unmanned Aerial Systems (SY Kim, AJ Endharta, JW Kim / Journal of the Korea Academia-Industrial Cooperation Society, vol.22, no.9 / 35-43 (9page))

23

Research of Risk Factor Development procedure establishment of accident scenario for hazard analysis (SY Kim, JW Kim, AJ Endharta, JY Yoo / Proceedings of 2021 Spring Conference the Korean Reliability Society / 112-112 (1page))

22

Maintenance ratio adequacy evaluation of high-speed railway in consideration of operation and maintenance environment (HJ Gwak, JY Yoo, JW Kim / Proceedings of 2021 Spring Conference the Korean Society for Railway / 187-187 (1page))

21

A Case Study on the Application of Design Process to Secure the Reliability and Safety of Unmanned Aerial Vehicle (JY Yoo, JW Kim, YS Kim / Proceedings of 2021 Spring Conference the Korean Society of Mechanical Engineers / 24-24 (1page))

2020
20

Economic design and maintenance of a circular k-out-of-n : G balanced system with load-sharing units, IEEE Transactions on Reliability, vol.69, no.4, AJ Endharta, YM Ko, 1465-1479

19

Optimal Replacement Interval for Multiple Repairable Units with Incomplete Data,Journal of the Korean Society for Railway, vol.23, no.12, AJ Endharta, JY Yoo, JW Kim, SS Choi, 1133-1141

18

Simulation Study on the Calculation of Weapon System’s Operating Maintenance Costs to develop LCS-P (GL Kim, HW Kim, J Jeong, JH Cha, DS Jeong / Journal of the Korea Academia-Industrial cooperation Society, vol.21, no.9 / 82-91 (10page))

17

Wireless tram reliability managing system architecture (JW Kim, DS Jeong, JY Kwon, SJ Lee / Proceedings of 2020 Fall Conference the Korean Reliability Society / 26-26 (1page))

16

Simulation Study on the Calculation of Weapon System’s Operating Maintenance Costs to develop LCS-P (GL Kim, HW Kim, J Jeong, JH Cha, DS Jeong / Journal of the Korea Academia-Industrial cooperation Society, vol.21, no.9 / 82-91 (10page))

15

Operating Stage System Reliability Management Procedure (JW Kim / Proceedings of 2020 Spring Conference the Korean Reliability Society / 528-537 (10page))

2019
14

Evaluation on the adequacy for operation profile of train using simulation, Proceedings of the 29th European Safety and Reliability Conference, JY Yoo, HW Kim, JW Kim,

13

Study on Effect of Left-Truncated Data Rate on ML Estimation for Power Law Process, Journal of the Korean Society for Railway, vol.22, no.9, AJ Endharta, JW Kim, SS Choi, 688-697

12

Development of Reliability Design Process Certification Index for Railway Vehicle Parts(IY Yang, JP Hong, SH Park, JY Lee, JW Kim / Proceedings of 2019 Spring Conference the Korean Society of Mechanical Engineers / 9-9 (1page))

2018
11

A Study on the adequacy of RAMS Objectives for Tram Operation Profile using Simulation(JY Yoo, HW Kim, SJ Lee, JW Kim / Proceedings of 2018 Fall Conference the Korean Society for Railway / 330-331 (2page))

2017
10

A study on RAMS Management Method for Railway System on Operation Phase (JW Kim, DS Jeong, JY Lee / Proceedings of 2017 Spring Conference the Korean Society of Mechanical Engineers / 100-100 (1page))

09

A Case Study on Estimation of Spare Parts Requirements for Air Brake System Using Simulation (JW Kim,Jeong Dosik, Lee Jiyoung / Proceedings of the 20th Anniversary Fall Conference of the Korean Society for Railway, pp.595–596, 2017)

08

Multi-Level Redundancy Allocation Optimization Problems (WY Yun, IH Chung, JW Kim / Journal of the Korean Institute of Industrial Engineers, vol.43, no.2 / 135-146 (12page))

07

A study on RAMS Management Method for Railway System on Operation Phase (JW Kim, DS Jeong, JY Lee / Proceedings of 2017 Spring Conference the Korean Society of Mechanical Engineers / 100-100 (1page))

2016
06

A Research of case of RAMS activity for SIL securement of platform safety door system (JY Lee, JW Kim / Proceedings of 2016 Fall Conference the Korean Reliability Society / 219-219 (1page))

05

Analysis on RAMS Requirements of the Technical Regulation for Railway Safety Management System (JW Kim, GY Sin, JW Jeon, JY Lee, HC Sin / Journal of the Korean Society for Railway / 1325-1330 (6page))

04

A Study on Condition Based Maintenance for Rolling Stock (GS Lee, JW Kim / Journal of the Korean Society for Railway / 1218-1221 (4page))

03

A study of method of selecting the priorities of the major safety components of the railway vehicle utilizing the AHP (SH Kim, YJ Yoo, HJ Jung, JW Kim, WY Lee / Journal of the Korean Society for Railway / 853-859 (7page))

02

Review on rollingstock condition-based maintenance system (GS Lee, JW Kim / Proceedings of 2016 Spring Conference the Korean Reliability Society / 206-206 (1page))

01

Conceptual design of railway component reliability fluctuation monitoring system (JW Kim, DS Jeong, GS Lee, JY Le / Proceedings of 2016 Spring Conference the Korean Reliability Society / 205-205 (1page))

2024
15

Abnormal Condition Diagnosis System Using Health Index-Based CUSUM Model (2024. 12. 11. registered)

2023
14

Method for Deriving Priority Application Devices for Integrity Prediction Management through Failure Mode and Effects Analysis (FMEA)(2023. 11. 29. registered)

13

Method and Apparatus for Identifying Fault Locations in Power Distribution Lines (2023. 02. 15. registered)

2022
12

Artificial Intelligence-Based Product Maintenance System and Method (2022. 11. 24. registered)

11

Apparatus for evaluating fault diagnosis model based on system availability and method thereof (2023. 5. 12. registered)

2021
10

Apparatus for predicting equipment failure using learning data based on maintenace history and method thereof (2023. 11. 8. registered)

09

Optimized maintenance schedule calculation method and apparatus for railway system (2022. 11. 18. registered)

08

Apparatus for managing breakdown of system and method thereof (2022. 10. 25. registered)

07

Method for calculating failure probability for system having redundancy structure and apparatus thereof (2021. 11. 3. registered)

2020
06

Apparatus and method of calculating failure intensity (2021. 10. 25. registered)

05

Simulation method for calculating maintenance ratio of railway vehicle and apparatus thereof (2022. 3. 22. registered)

04

Method for calculating optimal expected life cycle of units and apparatus thereof (2021. 7. 20. registered)

03

Method for managing units according to class using hazard prediction and apparatus thereof (2022. 4. 15. registered)

2019
02

Apparatus and method for guiding system maintenance (2022. 3. 3. registered)

2017
01

Apparatus for operating distributed system and method thereof (2019. 4. 22. registered)

2024
19

Integrated Safety Monitoring and Maintenance Management System for Railway Power Distribution Facilities(2024-12-13)

18

Similarity-Based Anomaly Detection System for Railway Power Distribution Lines(2024-06-24)

2023
17

Railway distribution line safety monitoring system reliability verification system (2023-12-12)

16

High-performance, high-durability tires for light rail and safety-enhanced health monitoring system V1.0 (2023-08-30)

15

CBM+/PHM effectiveness evaluation simulation system (failure prediction and health management effectiveness evaluation simulation system) (2023-01-30)

2022
14

Railway distribution line maintenance optimization and support system (2022-11-16)

13

Railway distribution line Risk/LCC analysis system (2022-11-16)

12

Railway distribution line AI-based condition diagnosis system (2022-11-16)

11

Data recording and analysis system at the testing stage to improve the reliability of unmanned vehicles (2022-11-02)

2021
10

Railway distribution line maintenance optimization and support system (2021-11-04)

09

Railroad vehicle maintenance rate analysis simulation (2021-11-02)

08

Railway Component Unit Development Phase Failure Data Collection, Analysis and Corrective Action System (FRACAS) (2021-10-18)

07

Railway Reliability, Availability, Maintainability, and Safety (RAMS) Monitoring System (2021-07-28)

2020
06

Reliability growth management system based on unmanned vehicle configuration management (2020-12-14)

05

Unmanned Vehicle Development Stage Data Management System (DCACAS) (2020-12-14)

04

Wireless low-floor tram comprehensive reliability management system (2020-12-14)

03

NemoFitDist (distribution suitability evaluation) (2020-08-28)

02

Railway Reliability, Availability, Maintainability, and Safety (RAMS) Analysis Solution (2020-08-13)

2017
01

Railroad Reliability, Availability, Maintainability, and Safety (RAMS) simulation program (2017-03-29)